Expert advice on tunnelling, drilling and geotechnical issues

Many years of worldwide experience combined with an energetic, problem-solving approach means Mudtech are well placed to help you when ground conditions start eating into your schedule.

This is particularly applicable to problems with:
• EPB and pumped muck
• Slurry systems
• Environmental issues
• HDD and borehole instability and break out
• Friction issues
• Dust control
... and we're always interested in new challenges.

For further information please CLICK HERE for contact details.

Many years of worldwide experience combined with an energetic, problem-solving approach means Mudtech are well placed to help you when ground conditions start eating into your schedule.

This is particularly applicable to problems with:

  • EPB and pumped muck
  • Slurry systems
  • Environmental issues
  • HDD and borehole instability and break out
  • Friction issues
  • Dust control


... and we're always interested in new challenges

Copyright © 2016 All Rights Reserved by MUDTECH Limited. 

 

<<Back to Services

Note
On site technical assistance is offered subject to availability.

EPB Seminars
CLICK HERE for details of EPB seminars and workshops.

Some typical problems

  • Breakout
  • Environmental issues
  • Excessive mud and chemical consumption
  • Excessive slurry disposal volume and cost
  • Gravel and cobbles
  • High annulus friction
  • High muck friction in the head
  • Ineffective flocculation
  • Muck unacceptable for low cost disposal
  • Pumped muck will not pump
  • Silt and sand in invert
  • Sloughing sands and shales
  • Slow progress in clay
  • Slurry density rise
  • Slurry loss to ground
  • Subsidence/heave from over/under mining
  • Swelling clays
  • Time lost from dumping and diluting
  • Underperformance of centrifuges etc
  • Washout at head
  • Water production from face - unable to form plug

Need Help Finding the Right Product?

Enter keywords in the box above to search the site to locate the right Mudtech product for the job